Вход на сайт

Просмотр новости

Найдите то, что Вас интересует

Opdenergy closes US$227 million financing for Chile renewables and BESS portfolio

Дата публикации: 09-07-2026 13:28:18

Independent power producer (IPP) Opdenergy has closed a US$227 million financing for its operating renewable energy portfolio in Chile. 

Основное содержимое страницы с новостью.

Opdenergy Chile US$227 millionAnnounced 7 July, the financing was lead by Japanese multinational financial institution Sumitomo Mitsui Banking Corporation (SMBC), international bank BNP Paribas, and Spanish public bank Instituto de Crédito Oficial (ICO).  Image: Opdenergy

Independent power producer (IPP) Opdenergy has closed a US$227 million financing for its operating renewable energy portfolio in Chile. 

Announced 7 July, the financing was lead by Japanese multinational financial institution Sumitomo Mitsui Banking Corporation (SMBC), international bank BNP Paribas, and Spanish public bank Instituto de Crédito Oficial (ICO).  

The US$227 million is linked to a portfolio of renewable energy assets, including the 104MW Sol de Los Andes Solar plant, the 90MW/513MWh Sol de los Andes battery energy storage system (BESS) located in the Atacama region, the 50MW La Estrella Wind farm in the O’Higgins region and a 17MW solar portfolio located in the Valparaiso region.  

Opdenergy Chile, which launched operations in 2014, has established a significant footprint in the country’s energy market.

This article requires Premium SubscriptionBasic (FREE) Subscription

Already a subscriber? Sign In

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or continue reading this article for free

Beyond its current 371MW of operating capacity, the company claims to maintain a diversified 748MW pipeline of projects scheduled to break ground within the coming year.

This portfolio includes the 95MW Dañicalqui and 132MW Vientos del Lago wind facilities in the southern Ñuble and Los Lagos regions, the 235MW Don Carlos solar installation in the Atacama Region, and two energy storage projects: the 196MW/1.2GWh Don Carlos BESS in Atacama and the 90MW/500MWh Alcones BESS in O’Higgins.

Opdenergy received environmental approval for the Don Carlos project in 2025. The BESS portion will be located next to the Don Carlos PV plant substation and is expected to begin operations in June 2027.

In 2021, Chile held a power auction, which was eight times oversubscribed and saw the country supporting 2GW of renewables and BESS projects. Opdenergy was among the successful bidders.

Recently, IPP Grenergy signed a 1TWh night-time power purchase agreement (PPA) for its 3.5GWh Elena BESS project in Chile.

Elena is part of Grenergy’s Oasis de Atacama complex, which co-locates BESS and solar PV generation at a multi-GW and multi-GWh scale.

Chile is experiencing a particularly strong year for renewables project commissioning. Research firm Benchmark Mineral Intelligence reported in its May monthly analysis that ContourGlobal activated a 231MW solar facility paired with a 1.3GWh BESS in the Tarapacá region during May.

June’s deployment figures will be even more substantial, with Grenergy inaugurating the Oasis de Atacama complex.

Our publisher Solar Media, part of Informa Connect, will host the Energy Storage Summit Latin America 2026 on 27-28 October, 2026, in Santiago Chile. Use our discount code ESN20 for 20% off tickets.

Battery & Energy Storage Tech Europe (BESTE) is Europe’s industrial scaling platform for stationary and industrial battery applications — not EVs. Taking place 8–9 September 2026 at Fira de Barcelona, BESTE brings together utilities, IPPs, energy-intensive industries, data centres, ports, rail, maritime, defence and aerospace OEMs — all deploying or integrating battery storage at scale. Over 100 companies already confirmed — including EDP Renewables, Acciona, Endesa, Naturgy, Neoen, Galp, Basquevolt and Veolia — alongside 40+ expert speakers and international institutional support from BEPA, BVES, LDES and Volta Foundation. Where Europe’s battery & ES ecosystem turns projects into reality.

You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Launching September 2026 in Berlin, Energy Storage Summit Germany is a new standalone event dedicated to Germany’s energy storage market. Bringing together investors, developers, policymakers, TSOs, manufacturers and optimisation specialists, the Summit explores the regulatory shifts, revenue models, financing strategies and technology innovations shaping large-scale deployment. With Germany targeting 80% renewables by 2030, it offers a focused platform to connect with the decision-makers driving the Energiewende and the future of utility-scale storage.

The Energy Storage Summit Central Eastern Europe is set to return in September 2025 for its third edition, focusing on regional markets and the unique opportunities they present. This event will bring together key stakeholders from across the region to explore the latest trends in energy storage, with a focus on the increasing integration of energy storage into regional grids, evolving government policies, and the growing need for energy security.

Energy Storage Summit Latin America brings together developers, investors, utilities and policymakers to explore how storage is advancing system stability, regulation, deployment and new revenue models across the region. With insights from Chile, Argentina, Brazil, Mexico and beyond, the Summit focuses on financing, policy clarity, hybridisation, supply chain development and project optimisation as LATAM accelerates its storage buildout.

Read Next

Avantus, with Fluence, is progressing on two solar-plus-battery energy storage system (BESS) projects in California, US.

Energy companies are accelerating battery storage deployment in Germany, with TotalEnergies and Kyon, Envision Energy and Ju:niz, and Flower announcing significant project developments and acquisitions.

Australia’s CSIRO has revised pumped hydro storage costs upward in the final version of its annual GenCost electricity cost report.

The Queensland government has reportedly shelved the proposed AU$6 billion (US$4 billion) Mt Rawdon pumped hydro project, ending state support for a mine-repurposing scheme that had attracted AU$50 million in government funding.

Energy-Storage.news Premium catches up with Giovanni Damato, US president of organic flow battery company CMBlu Energy about the company’s recent activity.

Most Popular

Схожие новости

#Наименование новостиТональностьИнформативностьДата публикации
1Giga Storage secures finance for 2.8GWh ‘critical infrastructure’ Belgium BESS0714-07-2026
2Enel Green Power построит в Чили солнечный парк, контролируемый дронами0027-08-2019
3Swiss firm Alpiq acquires 90% stake in BESS developer-operator Harmony Energy0509-07-2026
4Engie agrees offtake deal with developer for 625MWh of Spain BESS0506-07-2026
5Argentina awards 700MW BESS in elevenfold oversubscribed tender0513-07-2026
6Palau solar-plus-storage site to add 19.8MWh BESS in Australian-backed augmentation0710-07-2026
7Avantus progresses California solar-plus-storage projects, Fluence providing domestic content BESS0515-07-2026
8"Дочка" BP вложит $250 млн в строительство солнечной электростанции в Техасе0020-03-2020
9Global BESS deployments soar 27% in H1 2026, Saudi Arabia drives figures in June0715-07-2026
10Shanghai Electric завершает сделку проекта создания интегрированной угольной шахты0002-03-2020

Классификация: Пресс-релизы. Схожих патентов: 0. Схожих новостей: 10. Тональность: 0. Информативность: 5. Источник: www.energy-storage.news.